Local Authority Approval

We take away all  the hassel of preparing the applications and paperwork required for submission to the local authorities.

Such as:-

  • Planning and Building Warrant Applications are prepared
  • Paper plans are printed in A1 landscape
  • Location Plans 

At this stage three cheques need to be raised for the following parties:-

  • Planning Permission
  • Building warrant
  • CAF Designs Ltd

Generally as a rule of thumb Building Control and Planning Permission on average takes between 6-8 weeks